STURDY AND DURABLE - 50 ft long x 0.7 inch wide. High-quality nylon strap. Extra robust. Bright color in the middle. Visible in all kinds of terrain
SPECIAL NON-SLIP DESIGN - With woven-in rubber strips provide maximum non-slip grip. Prevent scratch your hands and friction burns when the dog pulling.
COMFORTABLE PADDED HANDLE - With neoprene padded hand loop. Lightweight and comfortable in your hands.
CONVENIENT USE - Twisting resistant and waterproof. Suitable for any weather and any size of dogs.
WIDE APPLICABILITY - Works great for tracking work like searching/hunting or training like recall/distance commands. And more freedom of movement on Long-distance outdoor activities.
Size and Color
S: 10 ft long x 0.7 inch wide. Color: black and green
M: 15 ft long x 0.7 inch wide. Color: black and red
L: 33 ft long x 0.7 inch wide. Color: black and red
XL: 50 ft long x 0.7 inch wide. Color: blue and green
Feature
·High-quality nylon strap with woven-in rubber strips
·Extra robust
·Non-slip with maximum grip
·Neoprene padded hand loop
·For dog training, e.g. when training requires distance
·For tracking work or searching for wounded game (hunting)
·For more freedom of movement
Choose a suitable length to buy! And enjoy the funny time with your pets!
YOGADOG - Only provide hight quality pet products. Bringing to you and your pet with joy and fun in the life.
YOGADOG - Durable 15 Ft to 50 Ft Dog Tracking / Training Lead Leash - Long Lead with Padded Handle - Special Non-slip Design - For any Szie of Dogs - B01CJKF2GU